Penerapan Adaptasi Teknologi di SD Negeri 2 Redin

Nisa'ul, Nurfajri Arofah (2022) Penerapan Adaptasi Teknologi di SD Negeri 2 Redin. Project Report. Institut Telkom Telkom Purwokerto. (Unpublished)

[img] Text
Cover.pdf

Download (458kB)
[img] Text
Abstract.pdf

Download (104kB)
[img] Text
Abstrak.pdf

Download (121kB)
[img] Text
BAB I.pdf

Download (133kB)
[img] Text
BAB II.pdf

Download (677kB)
[img] Text
BAB III.pdf

Download (151kB)
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (577kB) | Request a copy
[img] Text
BAB V.pdf

Download (8kB)
[img] Text
Daftar Pustaka.pdf

Download (123kB)
[img] Text
Lampiran.pdf
Restricted to Registered users only

Download (3MB) | Request a copy

Abstract

The Teaching Campus Program batch 3 lasts for 4 months, starting on March 1, 2022 – June 29, 2022. This program is attended by twenty thousand students from all over Indonesia. The Teaching Campus Team for SD Negeri 2 Redin consists of five members from various study programs and universities. The Teaching Campus of SD Negeri 2 Redin is accompanied by a Field Supervisor (DPL) and is guided by a civil servant teacher. In the success of the Campus Teaching agenda, the Campus Teaching team at SD Negeri 2 Redin focuses on three main programs, namely helping teach, assisting with technology adaptation, and assisting with administrative matters. The whole program has been implemented and received a good response from the big family of SD Negeri 2 Redin. The existence of the Teaching Campus has had a good impact on SD Negeri 2 Redin, especially in terms of introducing technology and teacher administration assistance. This final report contains all the activities of the Teaching Campus program at SD Negeri 2 Redin. With this, the authors hope that the Campus Teaching program will continue and can have a good impact on education in Indonesia.

Item Type: Monograph (Project Report)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Telecommunication and Electrical Engineering > Telecommunication Engineering
Depositing User: staff repository
Date Deposited: 07 Oct 2022 03:41
Last Modified: 07 Oct 2022 03:41
URI: http://repository.ittelkom-pwt.ac.id/id/eprint/8350

Actions (login required)

View Item View Item