Penanganan Fallout Activation Untuk Order Pasang Baru Indihome Di Witel Purwokerto

Amini, Puji Astiti (2023) Penanganan Fallout Activation Untuk Order Pasang Baru Indihome Di Witel Purwokerto. Technical Report. Institut Teknologi Telkom Purwokerto. (Submitted)

[img] Text
19101115_Amini Puji Astiti_Cover Laporan PKL - AMINI PUJI ASTITI -.pdf

Download (376kB)
[img] Text
19101115_Amini Puji Astiti_ABSTRACT - AMINI PUJI ASTITI -.pdf

Download (7kB)
[img] Text
19101115_Amini Puji Astiti_ABSTRAK - AMINI PUJI ASTITI -.pdf

Download (7kB)
[img] Text
19101115_Amini Puji Astiti_BAB I - AMINI PUJI ASTITI -.pdf

Download (200kB)
[img] Text
19101115_Amini Puji Astiti_BAB II - AMINI PUJI ASTITI -.pdf

Download (727kB)
[img] Text
19101115_Amini Puji Astiti_BAB III - AMINI PUJI ASTITI -.pdf
Restricted to Registered users only

Download (704kB) | Request a copy
[img] Text
19101115_Amini Puji Astiti_BAB IV - AMINI PUJI ASTITI -.pdf

Download (9kB)
[img] Text
DAFTAR PUSTAKA - AMINI PUJI ASTITI -.pdf

Download (184kB)
[img] Text
19101115_Amini Puji Astiti_LAMPIRAN - AMINI PUJI ASTITI -.pdf
Restricted to Registered users only

Download (451kB) | Request a copy

Abstract

Practical work is an activity during lectures that supports students in learning to enter the real world of work. By following this practical work, students gain knowledge about what happens in the world of work. In its development, the telecommunications sector in Indonesia has a very important role in supporting the development of various aspects in all fields. These fields include economics, education, business, information and communication, as well as sociocultural fields. One of the telecommunications industries engaged in network infrastructure and broadband network development in Indonesia is PT. Telkom Access. In this practical work, students can learn how to overcome obstacles in the New Line process caused by Fallout Activation. This causes the service to fail and become unusable. In order for the service to be used, the activation process must go to Activation Completed or PONR. There are two ways to handle Fallout Activation, the first is Retry (RR) and the second is TrigerFallout (TF). Prior to RR or TF, an analysis of the cause of the fallout was carried out using the ASAP application. One of the causes of Fallout Activation is because the Optical Distribution Point (ODP) datek is not appropriate, so the author suggests that the technician ensures that the datek ordered is in accordance with the datek in the field. Another cause is that the Optical Network Terminal (ONT) at the location is off so it cannot be read on the system. From the results of this experience, the author can conclude that this practical work is very beneficial for students, especially students who are ready to enter the world of work. Various knowledge and interesting experiences can be obtained from this practical work. Keywords: Fallout Activation, Activation Completed, RR, TF, ONT, ODP.

Item Type: Monograph (Technical Report)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Telecommunication and Electrical Engineering > Telecommunication Engineering
Depositing User: pustakawan ittp
Date Deposited: 22 May 2023 06:48
Last Modified: 22 May 2023 06:48
URI: http://repository.ittelkom-pwt.ac.id/id/eprint/9549

Actions (login required)

View Item View Item