Fazlur, Nur Rahman (2022) Analisa Beban Kerja Mental Menggunakan Metode NASA TLX Bagian Train Distribution di PT. Solusi Bangun Indonesia. Project Report. Institut Telkom Telkom Purwokerto. (Unpublished)
Text
Cover.pdf Download (1MB) |
|
Text
Abstract.pdf Download (88kB) |
|
Text
Abstrak.pdf Download (88kB) |
|
Text
BAB I.pdf Download (93kB) |
|
Text
BAB II.pdf Download (1MB) |
|
Text
BAB III.pdf Restricted to Registered users only Download (413kB) | Request a copy |
|
Text
BAB IV.pdf Restricted to Registered users only Download (89kB) | Request a copy |
|
Text
Daftar Pustaka.pdf Download (162kB) |
|
Text
Lampiran.pdf Restricted to Registered users only Download (700kB) | Request a copy |
Abstract
PT. Solusi Bangun Indonesia is an Indonesian public company that is part of the Semen Indonesia Group. PT. Solusi Bangun Indonesia Tbk, operates an integrated business of cement, ready mix concrete and aggregate production. In the logistics section of PT. Solusi Bangun Indonesia in the process of delivering its products using sea and land transportation, sea transportation using ships and land transportation using trucks and trains. In the process of shipping using rail land transportation there is a process of transporting goods to train cars, in the process there are several errors. In carrying out its activities in thesection, the Train Distribution pressure is not high enough so that the mental workload of workers increases. For this reason, it is necessary to analyze how much mental workload is experienced and what factors influence it by using a Fishbone Diagram. One of the methods used to measure mental workload is NASA-TLX. The NASA-TLX method is a mental workload measurement method that divides the workload into 6 dimensions of work element aspects. From the results of the calculation of the mental workload carried out by workers at the Train Distribution PT. Solusi Bangun Indonesia, which consists of Forklift Operators, Checkers and Tarpaulin Installers, is categorized as having a high mental workload. Based on the calculation of the WWL value, which includes the highest mental workload difference, namely theoperator forklift during the night shift with a value of 76.7.
Item Type: | Monograph (Project Report) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Faculty of Industrial Engineering and Design > Industrial Engineering |
Depositing User: | staff repository |
Date Deposited: | 19 Aug 2022 06:12 |
Last Modified: | 21 Aug 2022 04:12 |
URI: | http://repository.ittelkom-pwt.ac.id/id/eprint/7731 |
Actions (login required)
View Item |