Minimasi Waste Pada Proses Produksi PT. Astra Honda Motor (AHM) Dengan Konsep Lean Manufacturing

Firdayanthi, Lestiana (2021) Minimasi Waste Pada Proses Produksi PT. Astra Honda Motor (AHM) Dengan Konsep Lean Manufacturing. Undergraduate Thesis thesis, Institut Teknologi Telkom Purwokerto.

[img] Text
COVER.pdf

Download (509kB)
[img] Text
ABSTRACT.pdf

Download (74kB)
[img] Text
ABSTRAK.pdf

Download (98kB)
[img] Text
BAB I.pdf

Download (128kB)
[img] Text
BAB II.pdf

Download (184kB)
[img] Text
BAB III.pdf

Download (113kB)
[img] Text
BAB IV.pdf

Download (290kB)
[img] Text
BAB V.pdf

Download (178kB)
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (135kB) | Request a copy

Abstract

This research was conducted on the production process of the fuel tank line of the welding department of PT. Astra Honda Motor (AHM). This research was conducted because of the large amount of waste generated by the welding department in the production process. One example of the waste produced is a product defect which reaches 7% of the total production. The data collection method used is field observation and secondary data obtained from sources. Data processing is carried out using two tools, namely Value Stream Mapping (VSM) and Failure Mode and Effect Analysis (FMEA). VSM is used to map the flow of the production process and identify which processes waste a lot of time. In addition, VSM is also used to propose improvements to the production process. While FMEA is used to analyze the effects that arise from the waste and to determine the priority level of which waste should be minimized. The results of this study showed that based on the current state map of VSM, the total lead time was 1210 seconds with a total non-value added (NVA) time of 532 seconds, and the process cycle efficiency (PCE) of 10.91%. Based on FMEA, the most common wastes are defect waste and waiting waste. After repairing the VSM future state map, the total lead time and total NVA time were reduced to 860 seconds and 332 seconds, respectively. The PCE value also increased by 4.44%, to 15.35%. Key word: Lean manufacturing, waste, VSM, FMEA, fuel tank

Item Type: Thesis (Undergraduate Thesis)
Subjects: T Technology > T Technology (General)
Divisions: Faculty of Industrial Engineering and Design > Industrial Engineering
Depositing User: pustakawan ittp
Date Deposited: 31 Mar 2022 08:40
Last Modified: 31 Mar 2022 08:40
URI: http://repository.ittelkom-pwt.ac.id/id/eprint/7183

Actions (login required)

View Item View Item