Stefanus, Tommy Christian Widianto (2017) Simulasi dan analisis jaringan Fiber To The X (FTTX) Menggunakan Teknologi Gigabit Passive Optical Network (GPON) : Purwokerto Timur. Undergraduate Thesis thesis, Institut Teknologi Telkom Purwokerto.
|
Text
COVER.pdf - Accepted Version Download (765kB) | Preview |
|
|
Text
ABSTRAK.pdf - Accepted Version Download (409kB) | Preview |
|
|
Text
ABSTRACT.pdf - Accepted Version Download (387kB) | Preview |
|
|
Text
BAB I.pdf - Accepted Version Download (501kB) | Preview |
|
|
Text
BAB II.pdf - Accepted Version Download (756kB) | Preview |
|
|
Text
BAB III.pdf - Accepted Version Download (1MB) | Preview |
|
Text
BAB IV.pdf - Accepted Version Restricted to Registered users only Download (651kB) | Request a copy |
||
|
Text
BAB V.pdf - Accepted Version Download (480kB) | Preview |
|
|
Text
DAFTAR PUSTAKA.pdf - Accepted Version Download (344kB) | Preview |
Abstract
customer using fiber optic as conduction medium. That form is supports high capability to provide triple play services,such as data, voice, and video. Performance of FTTx network closely related to the network architecture from OLT until ONT, especially using Gigabit Passive Optical Network (GPON). The purpose of the research is have purpose to analyze the performance of FTTx using GPON technology with variation splitter configuration with parameter link budget, rise time budget, and bit error rate. Based on calculation simulation and calculation results, shows that utilization 1:4 splitter get the highest received power for -22.06 dBm and values of BER 1.79x10-22 for FTTC, -22.04 dBm and 4.29x10-18 for FTTB, -22.25 dBm and 1.25x10-15 for FTTH, and rise time budget for 0.241 ns. For 1:8 splitter get the received power for -25.07 dBm and values of BER 7.35x10-7 for FTTC, -25.05 dBm and 8.56x10-6 for FTTB, -25.26 dBm and 3.55x10-5 for FTTH, and rise time budget for 0.241 ns. For 1:16 splitter get received power for -27.07 dBm and values of BER 3.89x10-3 for FTTC, -27.56 dBm and 8.49x10-3 for FTTB, -27.76 dBm and 1.47x10-2 for FTTH, and rise time budget for 0.241 ns. Keywords : FTTx, GPON, Link Budget,Rise Time Budget, BER
Item Type: | Thesis (Undergraduate Thesis) |
---|---|
Subjects: | T Technology > T Technology (General) |
Divisions: | Faculty of Telecommunication and Electrical Engineering > Telecommunication Engineering |
Depositing User: | staff repository 1 |
Date Deposited: | 03 Jan 2018 03:00 |
Last Modified: | 23 Apr 2021 03:56 |
URI: | http://repository.ittelkom-pwt.ac.id/id/eprint/124 |
Actions (login required)
View Item |