Pengendalian Kualitas Untuk Mengatasi Produk Cacat Pada Proses Produksi Sarung Di Pt. Sukorintex Batang

Dya, Ayu Listiyani (2022) Pengendalian Kualitas Untuk Mengatasi Produk Cacat Pada Proses Produksi Sarung Di Pt. Sukorintex Batang. Undergraduate Thesis thesis, Institut Teknologi Telkom Purwokerto.

[img] Text
cover.pdf

Download (1MB)
[img] Text
abstract.pdf

Download (57kB)
[img] Text
abstrak.pdf

Download (57kB)
[img] Text
bab 1.pdf

Download (157kB)
[img] Text
bab 2.pdf

Download (319kB)
[img] Text
bab 3.pdf

Download (159kB)
[img] Text
bab 4.pdf
Restricted to Registered users only

Download (516kB) | Request a copy
[img] Text
bab 5.pdf

Download (63kB)
[img] Text
daftar pustaka.pdf
Restricted to Registered users only

Download (191kB) | Request a copy

Abstract

This research was conducted on the sarong production process in the weaving department of PT. Sukorintex. The weaving department was chosen because it produces the most types of defective products compared to other departments at 71%. The data collection method was carried out by field observations to obtain primary data and secondary data obtained from the company. Data processing is carried out using six sigma method and Failure Mode and Effect Analysis (FMEA). Six sigma method is used to find and overcome the causes of defects that occur by processing data with the define, measure, analyze, and improve (DMAI) stages and FMEA is used to make suggestions for improvements. The results of the study found that there were six types of defects, namely flot defects, damaged edges, barjarang, lysing, color differences, and loose weft in the weaving department which must be prioritized to find the cause. In the flot defect ranking the highest RPN (Risk Priority Number) value is 294, tepi rusak the highest RPN value is 448, barjarang is 280, color difference is 72, lysing is 448, and tepi kendor is 343. Based on the analysis of the FMEA method through ranking the recommended RPN value for repairs is that one of them prioritizes repairs on machine factors such as setting a routine schedule for maintenance and cleaning of machines every week. Keyword: Weaving, six sigma, DMAI, FMEA, RPN.

Item Type: Thesis (Undergraduate Thesis)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Industrial Engineering and Design > Industrial Engineering
Depositing User: staff repository
Date Deposited: 15 Aug 2022 04:46
Last Modified: 15 Aug 2022 04:46
URI: http://repository.ittelkom-pwt.ac.id/id/eprint/7651

Actions (login required)

View Item View Item