Perancangan dan monitoring jaringan FTTH pda wilayah JATENG II regional IV

Rizal, Maulana H (2017) Perancangan dan monitoring jaringan FTTH pda wilayah JATENG II regional IV. Technical Report. Institut Teknologi Telkom Purwokerto. (Unpublished)

[img]
Preview
Text
Cover.pdf - Accepted Version

Download (316kB) | Preview
[img]
Preview
Text
Abstract.pdf - Accepted Version

Download (145kB) | Preview
[img] Text
BAB I.pdf - Accepted Version
Restricted to Registered users only

Download (382kB)
[img] Text
BAB II.pdf - Accepted Version
Restricted to Registered users only

Download (436kB)
[img] Text
BAB III.pdf - Accepted Version
Restricted to Registered users only

Download (1MB)
[img] Text
BAB IV.pdf - Accepted Version
Restricted to Registered users only

Download (254kB)
[img]
Preview
Text
Daftar Pustaka.pdf - Accepted Version

Download (114kB) | Preview

Abstract

Field Work Practices conducted at PT. Telkom Witel Solo Access in the period of August 1, 2017 to August 31, 2017. PT. Telkom Access is divided into several divisions, namely HD division, SDI, Survey and Design. In the implementation of street vendors, the authors placed on the HD and Survey design. One of the tasks of the HD division is to monitor the balance of regular tickets and balance of gamas tickets (mass disorder) with NOSSA and embassy applications. While the task of the division of Survey and Design is to design LLD (Low Level Design) using google earth applications, TeNOSS, and VMWare. At the time of the implementation of practical work there some first obstacles regarding to login account that is given because the account is confidential company and not just anyone can use as well as a mass disorder that occurred in the region Central Java II Regional IV. To overcome this can be done by always reporting any incoming ticket and update any events that exist to the field technician for the balance of the ticket is reduced. As for the designing LLD constraints faced the search location that has not been missed optical distribution network and the preparation. To overcome this matter can be done in consultation with colleagues at work area of Central Java II Regional IV other. Used is NOSSA Telkom, Embassy, Google Earth, TeNOSS, VMWare. The equipment needed is a laptop, UTP cable and data cable. For monitoring alone covers the area of Central Java Regional IV centered in Solo Serta to design the LLD located in Salatiga. The parameters measured are the total Balance rate in time as well as the total amount of price required for FTTH planning in the region. Keywords: Ticket Balance Monitoring, GAMAS, LLD (Low Level Design), FTTH, NOSSA Telkom, Embassy, Google Earth, VMware.

Item Type: Monograph (Technical Report)
Subjects: T Technology > T Technology (General)
Divisions: Faculty of Telecommunication and Electrical Engineering > Telecommunication Engineering
Depositing User: staff repository 3
Date Deposited: 01 Feb 2018 08:16
Last Modified: 23 Jul 2020 06:10
URI: http://repository.ittelkom-pwt.ac.id/id/eprint/425

Actions (login required)

View Item View Item