Perancangan Fiber To The Home (FTTH) PT. Telkom Akses menggunakan google earth pada wilayah Maguwoharjo, Depok Sleman Yogyakarta

Cahyani, Sulistiana (2014) Perancangan Fiber To The Home (FTTH) PT. Telkom Akses menggunakan google earth pada wilayah Maguwoharjo, Depok Sleman Yogyakarta. Diploma thesis, Institut Teknologi Telkom Purwokerto.

[img]
Preview
Text
COVER.pdf - Accepted Version

Download (1MB) | Preview
[img]
Preview
Text
ABSTRACT.pdf - Accepted Version

Download (183kB) | Preview
[img]
Preview
Text
ABSTRAK.pdf - Accepted Version

Download (182kB) | Preview
[img]
Preview
Text
BAB I.pdf - Accepted Version

Download (313kB) | Preview
[img]
Preview
Text
BAB II.pdf - Accepted Version

Download (1MB) | Preview
[img]
Preview
Text
BAB III.pdf - Accepted Version

Download (1MB) | Preview
[img] Text
BAB IV.pdf - Accepted Version
Restricted to Registered users only

Download (1MB) | Request a copy
[img]
Preview
Text
BAB V.pdf - Accepted Version

Download (106kB) | Preview
[img]
Preview
Text
DAFTAR PUSTAKA.pdf - Accepted Version

Download (360kB) | Preview

Abstract

This thesis explores the design of network Fiber to The Home (FTTH) in the region Maguwoharjo, Depok Sleman Yogyakarta. Fiber To The Home (FTTH) access network is a technology architecture that uses optical fiber as the primary medium is connected to the customer to provide telephone service, internet and TV. The development of this technology to replace copper wires. In designing the study, the number of passes that are in the area Maguwoharjo, Depok Sleman Yogyakarta as many as 3934 were divided into 5 boundary. In this study the author uses boundary 1 the number of passes and 673 using a one stage scenario 1: 32 and two stage 1: 2  1: 16 and 1: 4  1: 8 to be used as the design of the access network Fiber To The Home (FTTH). From the research design of Fiber To The Home (FTTH) for Maguwoharjo region, Depok Sleman Yogyakarta obtained based on link budget calculations using one-stage scenario 1: 32 for the closest distance is 21.13 dB, 21.36 dB and medium distance farthest distance 21 , 49 dB. In the link budget calculation using the two-stage scenario 1: 2  1: 16 for the closest distance has 21.48 dB, 21.50 dB and medium range greatest distance is 21.84 dB. In the link budget calculation using the two-stage scenario 1: 4  1: 8 to 21:41 shortest distance dB, 21.64 dB and medium distance farthest distance is 21.79 dB. It can be concluded from the link budget calculation using three scenarios that it is best to use a one-stage scenario 1: 32. If the location of the site passes over the distance of 100 meters, it will result in the quality of voice, data that is not maximal. Based on the calculation of the Bill Of Quantity (BOQ) by using one-stage scenario 1: 32 to determine the required device in the feeder cable has a number of 2.56 km and 67300 meters drop cable and the two-stage scenario 1: 2  1: 16 to determine the required on the cable distribution is 4.47 km and has a number of ODP 43 pieces. Keywords: FTTH, Google Earth, passes, Link Budget, Bill Of Quantity (BOQ)

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: Faculty of Telecommunication and Electrical Engineering > Diploma of Telecommunication Technology
Depositing User: staff repository 1
Date Deposited: 19 Jan 2018 07:05
Last Modified: 23 Apr 2021 02:52
URI: http://repository.ittelkom-pwt.ac.id/id/eprint/300

Actions (login required)

View Item View Item