PERANCANGAN ULANG TATA LETAK FASILITAS (RE-LAYOUT) PADA CV. DIANTAMA TRAFFINDO

ASHAFIRA, PRAMESTHI (2023) PERANCANGAN ULANG TATA LETAK FASILITAS (RE-LAYOUT) PADA CV. DIANTAMA TRAFFINDO. Undergraduate Thesis thesis, Institut Teknologi Telkom Purwokerto.

[img] Text
COVER.pdf

Download (929kB)
[img] Text
ABSTRACK.pdf

Download (182kB)
[img] Text
ABSTRAK.pdf

Download (360kB)
[img] Text
BAB I.pdf

Download (583kB)
[img] Text
BAB II.pdf

Download (806kB)
[img] Text
BAB III.pdf

Download (725kB)
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (1MB)
[img] Text
BAB V.pdf

Download (438kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (554kB)
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (200kB)

Abstract

Facility layout problems in the two industries are one of the factors that play an important role in increasing productivity. A bad layout can lead to ineffective transfers and increase costs. CV. Diantama Traffindo is a manufacturing company that produces various kinds of traffic signs. Fulfillment of customer requests at the company is by way of make to order or MTO. The results of the field study obtained from this study were that there were delays in the process of fulfilling requests due to inefficient production processes, causing activities outside working hours and soaring material handling costs. Material movement in the initial layout has a distance of 2,603 m per week, and material handling costs are IDR 1,231,010 per week. Therefore the researchers designed the facility layout to cut distances and minimize material handling costs. The method used is Systematic Layout Planning (SLP) to compare the initial layout with several proposed layouts. The results of the study show that the distance of the material passage on the production floor with proposal I has a change of 1,115 m per week, with a material handling fee of IDR 372,908. while proposal II has a distance change of 1,249.5 m per week, with a material handling fee of IDR 438,498. Based on the results of the research, proposed layout I is the best recommendation with a pruning of 69%. Keywords: SLP, Layout, Material Handling

Item Type: Thesis (Undergraduate Thesis)
Subjects: T Technology > T Technology (General)
T Technology > TS Manufactures
Divisions: Faculty of Industrial Engineering and Design > Industrial Engineering
Depositing User: repository staff
Date Deposited: 29 Jul 2024 03:52
Last Modified: 29 Jul 2024 03:52
URI: http://repository.ittelkom-pwt.ac.id/id/eprint/10795

Actions (login required)

View Item View Item