Phyrigiant, Richo Albarzani (2020) Commissioning Pada Instalasi Antena Microwave 15 Ghz. Technical Report. Pustakawan, Perpustakaan Institut Teknologi Telkom Purwokerto. (Unpublished)
Text
COVER.pdf Download (287kB) |
||
|
Text
ABSTRACT.pdf Download (142kB) | Preview |
|
|
Text
ABSTRAK.pdf Download (144kB) | Preview |
|
|
Text
BAB I.pdf Download (263kB) | Preview |
|
|
Text
BAB II.pdf Download (261kB) | Preview |
|
Text
BAB III.pdf Restricted to Registered users only Download (1MB) | Request a copy |
||
|
Text
BAB IV.pdf Download (148kB) | Preview |
|
|
Text
DAFTAR PUSTAKA.pdf Download (209kB) | Preview |
|
Text
LAMPIRAN.pdf Restricted to Registered users only Download (2MB) | Request a copy |
Abstract
Communication technology is a major human need in today's modern era. The communication technology used must be wireless capable of handling long distances, fast and flexible. This need can be met by the presence of mobile / cellular communication technology. One of the communication processes that occur in mobile communication technology is supported by an antenna attached to the BTS tower (Base Transceiver Station), namely sectoral and microwave antennas. Sectoral antennas transmit and receive radio frequency waves from and to communication devices such as smartphone users, while microwave antennas function to transmit and receive radio frequency waves from and to other microwave antennas or from BTS to BSC and between BTS so that between sites can communicate. The installation process of microwave antennas is not only limited to installing microwave antennas and ODU (Outdoor Unit) on BTS towers and pointing, but there is also one important process, namely commissioning. Commissioning is the process of inputting parameter values into the IDU (Indoor unit) device. A commissioning process is required according to the planning on the link budget so that the microwave antenna installation process can run well and get optimal signal quality according to the planning on the link budget. In this practical work commissioning was successfully carried out to connect the Girirejo-Tegalrejo site with the RSL (Receive Signal Level) output not much different from the link budget. The device can work properly and can connect with other sites that are in one hop after the commissioning process is carried out. Keywords : Base station, Microwave antenna, Commissioning
Item Type: | Monograph (Technical Report) |
---|---|
Subjects: | T Technology > T Technology (General) |
Divisions: | Faculty of Telecommunication and Electrical Engineering > Telecommunication Engineering |
Depositing User: | pustakawan ittp |
Date Deposited: | 10 Jul 2021 11:08 |
Last Modified: | 10 Jul 2021 11:08 |
URI: | http://repository.ittelkom-pwt.ac.id/id/eprint/6193 |
Actions (login required)
View Item |